1600mm Left Hand Square Shower Bath

SKU: WBS1685L

£463.33

20 in stock

10 People watching this product now!

Fast Shipping

Carrier information

20k products

Payment methods

24/7 Support

Unlimited help desk

2-day Delivery

Track or off orders

Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option. Designed and built to the highest quality. Sanitary Grade Acrylic. Un-drilled. Supplied with leg set. Bath panels sold separately.

Range

Shower Baths

Style

Contemporary

Guarantee

5 Years

Material

Acrylic

Color

White

Seat Included

No

Number of Tap Holes

0

Waste Included

No

WRAS Approved

N/A

WRAS Approval Number

N/A

TMV2 Approved

N/A

TMV2 Approval Number

N/A

TMV3 Approved

N/A

TMV3 Approval Number

N/A

Slip Resistant

No

Displaced Capacity

130 l

Volume

200 l

Bath Panel Included

No

Legs Included

Yes

Shipping Load Type

Multi Carton

0 reviews
0
0
0
0
0

There are no reviews yet.

Be the first to review “1600mm Left Hand Square Shower Bath”

Your email address will not be published. Required fields are marked *

Additional information
Range

Shower Baths

Style

Contemporary

Guarantee

5 Years

Material

Acrylic

Color

White

Seat Included

No

Number of Tap Holes

0

Waste Included

No

WRAS Approved

N/A

WRAS Approval Number

N/A

TMV2 Approved

N/A

TMV2 Approval Number

N/A

TMV3 Approved

N/A

TMV3 Approval Number

N/A

Slip Resistant

No

Displaced Capacity

130 l

Volume

200 l

Bath Panel Included

No

Legs Included

Yes

Shipping Load Type

Multi Carton

Reviews (0)
0 reviews
0
0
0
0
0

There are no reviews yet.

Be the first to review “1600mm Left Hand Square Shower Bath”

Your email address will not be published. Required fields are marked *

Description

Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option. Designed and built to the highest quality. Sanitary Grade Acrylic. Un-drilled. Supplied with leg set. Bath panels sold separately.